¶¶Òõ¶ÌÊÓƵ

CST 120 Ton Ironworker

CST 120 Ton Ironworker

The Industrial Heavyweight

Your 120 Ton Ironworker comes equipped with the following features:

  • Uses 219 punch and 413 die
  • Fully guarded
  • Adjustable steel strippers
  • Fully charged hydraulic system
  • Electric stroke control
  • Shear blades reversible for extra long life
  • 3 LED lights installed in shearing station
  • Low rake angle on shear blades
  • Remote foot pedal operation
  • Coper notcher standard in rear station
  • Direct drive pump

CST 120 Ton Ironworker

Image Description Part No. Availability Price Quantity Purchase
120 Ton 3 Phase 208V with PowerLink System CST-IW120-3PH208-AC900 2 Weeks $45,239.00
120 Ton 3 Phase 230V with PowerLink System CST-IW120-3PH230-AC900 2 Weeks $45,239.00
120 Ton 3 Phase 380V with PowerLink System CST-IW120-3PH380-AC900 2 Weeks $45,999.00
120 Ton 3 Phase 460V with PowerLink System CST-IW120-3PH460-AC900 2 Weeks $45,889.00
120 Ton 3 Phase 575V with PowerLink System CST-IW120-3PH575-AC900 2 Weeks $46,549.00